Skip to main content

06

News — All

D-Drill quietly removes Southampton Hospital roof

Any drilling work at a hospital requires critical control of the noise level and timescale of the job, which is why C.G... Read more

Drilling to the Core at Shard London Bridge

D-Drill was the first drilling contractor to be involved in the Shard London Bridge project. Sub contracted directly by... Read more

Quiet Cutting in Gateshead Hospital

Even the small jobs need the expert handling of the specialised D-Drill team. This time the North East branch, run by... Read more

D-Drill Bites into Concrete Biscuit at Chocolate Factory

On the fourth floor of a chocolate factory in Chester, D-Drill got to work cutting out concrete sections for... Read more

Morgan Est Appoints D-Drill for Live Substation Cable Removal

Safety was top of the agenda for D-Drill when they worked within a live substation in Liverpool recently. Morgan Est... Read more