Skip to main content

Jaguar Land Rover, Gaydon

D-Drill remove edge of reinforced concrete wall

D-Drill were called out to the Jaguar Land Rover site in Gaydon to remove the edge from a reinforced concrete wall. The wall was holding a fresh water holding tank that needed to be replaced.

The team used a track saw to make a vertical cut around the perimeter of the slab so it could be removed. The tank was being replaced due to weakness so it was vital that there was no vibration that could damage the tank.

The work was completed in a tight space, yet the customer commented on a neat cut and the helpfulness of the D-Drill team.

Back to Projects