This site uses cookies to bring you the best experience. Find out more
Skip to main content

Projects

View our past projects

 

Industrial Unit, Coventry

Industrial Unit, Coventry

Precision Required when D-Drill Successfully Remove Mezzanine Floor D-Drill was contracted to carefully remove a 108 tonne...

Dundee Harbor

Dundee Harbor

D-Drill tackles the tide to prevent future flooding D-Drill successfully drilled holes in a harbour wall in Dundee to insert...

Jaguar Land Rover, Gaydon

Jaguar Land Rover, Gaydon

D-Drill remove edge of reinforced concrete wall D-Drill were called out to the Jaguar Land Rover site in Gaydon to remove the...

Southampton Hospital

Southampton Hospital

D-Drill quietly removes Southampton Hospital roof Any drilling work at a hospital requires critical control of the noise level...

Chocolate Factory, Chester

Chocolate Factory, Chester

D-Drill Bites into Concrete Biscuit at Chocolate Factory On the fourth floor of a chocolate factory in Chester, D-Drill got to...

Waycon Precast, Exeter

Waycon Precast, Exeter

Lift shaft panel reduction D-Drill South Wales was asked by Waycon Precast at their location near Exeter to reduce the height...